Home at your fingertips

Cameras, entry, audio and home automation for Dubai villas. Installed, connected and looked after by one licensed team.

Rendered front view of a two-storey villa with lit windows, palms either side

Gated entry

The gate recognises you on approach and opens without a remote, a fob or a phone. It closes behind you on its own.

Climate

Rooms hold the temperature you set, adjusting as the sun moves round the house and stepping back when a room is empty.

Curtains and shading

Curtains and blinds move on a schedule, on a scene, or with the sun, keeping the afternoon heat out before the cooling has to work for it.

Lighting

Lighting follows the time of day, warming as the evening comes in. Scenes cover the whole house rather than one switch at a time.

Our Process

  1. Complete home automation cycle

    Five steps, from the first visit to the years after it. A technician assesses the house, you get a fixed itemised price within 48 hours, and the installation happens while you carry on living there.

    At handover we set the system up with you and train everyone who will use it, then leave a full record of what went in and where. After that you have one number to call.

    You see the price before the work starts and the documentation before we leave. Nothing in this process arrives as a surprise.

    [3 days]

  2. Step 01

    Site Assessment

    A technician visits, checks your cabling, network and existing systems, and listens to how you use the house.

    [90 minutes]

    A surveyor kneeling on a bare floor, writing up findings on a clipboard
    Engineers measuring a wall together, checking what is behind it before any work starts
  3. Step 02

    Proposal

    A fixed, itemised price within 48 hours. Every device, every hour of work, written down.

    [48 hours]

    A room sketched out on squared paper by hand, one element at a time
  4. Step 03

    Installation

    Two to three days for a smaller system, four to five for a full villa. You stay in the house throughout.

    [2 to 5 days]

    An installer fitting an access control panel to a wall beside a glazed door
    A technician working on a roof, harnessed and fixing equipment into place
  5. Step 04

    Handover

    We set it up with you, train everyone who'll use it, and leave a full record of what was installed and where.

    [1 day]

    Two people over a printed plan, one walking the other through it point by point
  6. Step 05

    Care

    Maintenance, updates and one number to call, for as long as you want us.

    [365 days]

    A technician on a ladder opening a ceiling hatch to reach the equipment above it
    An engineer reaching up to check a fixing overhead during a routine inspection

Friday, 9:14pm. The gate won’t open.

This is the moment that decides whether a smart home was worth it. With Smarthaus Premium Care you call one number, day or night, and someone who knows your installation picks up.

Annual maintenance packages

  • Standard Care

    Two planned visits a year, remote monitoring between them, and software kept current. When something needs attention, we respond the next business day.

    AED 5,000/year

  • Premium Care

    Everything in Standard Care, plus priority response within 4 hours, seven days a week, including evenings and weekends. One number, a named engineer who knows your installation, and no triage queue.

    Premium Care response window to be confirmed with Sunil.

    AED 8,000/year

Book a site visit

Tell us a little about your home and we’ll call you back. During business hours, that’s usually within the hour.

We use your details to answer your enquiry and nothing else. Read how we handle them in our Privacy Policy.